top of page

Installation Guide

All you need is a pair of Hands!

STEP 1:

Screw the spikes in one end of legs

Step 1.jpg

STEP 2:

Insert M8 Screw from the countersunk side of the panel and turn the leg while pressing the M8 screw head from the other side.

Step 2.jpg

STEP 3:

Gently position the first tier on floor and add floor protection pads by lifting the legs one by one.

Step 3.jpg

STEP 4:

Position one of the rear legs of the second tier (One at the time).

step 4.jpg

STEP 5:

Position the other rear leg of the second tier (Applicable to four legs setup).

Step 5.jpg

STEP 6:

Gently position both front legs on the M8 Screw Heads of the shelf below at the same time.

Step 6.jpg

STEP 7:

Move the front legs to perfectly Position the spikes in the screw head holes.

Step 7.jpg

STEP 8:

Repeat steps 4 to 7 for all other tiers.

Step 8.jpg

STEP 9:

Fine-tune the leg adjustments. Once adjusted turn the washer to hold the position against the stainless steel cap.

Step 9.jpg

Enjoy!

Installation: Services
bottom of page